Stuffs covered in day 9:
- Spark plugs
- Flywheel install
- Clutch Install
- Transmission Install
- Mounting the motor
Stuffs covered in day 9:
Labels: clutch , flywheel , rb25det , RB25DET build diary , spark plugs , transmission , z32
There was a lack of update on this site as the new president of my company has forced a global restructuring of the multi national corporation. This probably meant that alot of the workforce will have to be laid off sometime at the final quarter of the year. Alot of time has been spent on updating my CV to justify my existance in the company.
Anyways, here is day 8 of the build. Stuffs covered in this post:
Labels: alternator , ATI damper , motor mounts , rb25det , RB25DET build diary , thermostat
Copyright 2009 -
Race Breed
Blogspot Theme Design by: Ray Creations, HostingITrust.com Tested by Blogger Templates